INSTALLATION OF THE CONTROLIT GS UNDERLAY

  • Under mechanically installed Single layer waterproofing
    It is freely rolled up under the waterproofing layer

Single layer waterproofing

Mechanically fixed waterproofing
1. Bearing structure
2. Vapour barrier
3. Primary layer of the thermal-insulation
4. Slope-creating layer
5. Top coat of the thermal-insulation
6. Controlit GS electrically conductive layer
7. Mechanically fixed waterproofing

  • Under mechanically installed Two layer waterproofing
    It is freely rolled up under the first waterproofing layer

Two layer waterproofing

Mechanically fixed bitumen base layer
1. Bearing structure
2. Slope-creating layer
3. Vapour barrier
4. Primary layer of the thermal-insulation
5. Top coat of the thermal-insulation
6. Controlit GS electrically conductive layer
7. Mechanically fixed bitumen base layer
8. Bitumen top coat

  • Melted between two Waterproofing layers
    It is freely rolled on the first waterproofing Layer it is melted while rolling the
    second waterproofing layer Min. weight of one layer 3.5KG/m2

between two Waterproofing layers

Built-up bitumen base layer
1. Bearing structure
2. Vapour barrier
3. Primary layer of the thermal-insulation
4. Top coat of the thermal-insulation
5. Film
6. Slope-creating concrete layer
7. Bitumen ground coat
8. Built-up bitumen base layer
9. Controlit GS electrically conductive layer
10. Bitumen top coat

INSTALLATION EXAMPLES

  • Controlit GS Mechanically installed under one layer waterproofing

under one layer waterproofing 1 under one layer waterproofing 2 under one layer waterproofing 3 under one layer waterproofing 4

  • Controlit GS Mechanically installed under two layer waterproofing

between two layers of waterproofing 1 between two layers of waterproofing 2 between two layers of waterproofing 3

  • Controlit GS melted between two layers of waterproofing

between two layers  1 between two layers  2 between two layers  3 between two layers 4